FOR WET or DRY HIRE

2 x Caterpillar D9T Dozers

2 x Caterpillar D10R Dozers

1 x Kleeman MR130 Evo2 Impact Crusher

1 x Kleeman MS21ZAD Screener

Various size Excavators, ranging from 14 ton to 35 ton

Various size Loaders ranging from Komatsu WA 320 to Caterpillar 980K

Caterpillar 12m Garders (GPS fitted)

Prime Mover and Double Road Train Configurations

12 - 16 ton ton Padfoot and Smooth Drum Rollers (Caterpillar)

Caterpillar Skid Steer Bobcats 259B Sizes

15,000KL Watercarts and 20,000 - 25,000KL Watercarts

Millbrook Rd contract award

                                          Palmer Civil Construction was awarded the Millbrook Rd contract by the City Of Albany in 2018. The project has recently been completed, with the scope of works including the construction of earthworks, road works and drainage. It involved full width pavement reconstruction, pavement overlay, rehabilitation and shape/correction of the existing pavement, plus widening of the existing road. The project was completed within the timeframe. 

 

Heavy Diesel Apprenticeship

Palmer Civil Construction are proud to be actively involved in training and up-skilling our workforce. We currently have Michael Kerr engaged in his second year of a Heavy Plant Mechanical apprenticeship. Michael is a valued member of our organisation and we are excited to be able to give him the opportunity to obtain a large range of new skills culminating in the award of a Nationally recognised trade qualification.

The benefits in employing apprentices go both ways, as It is a time proven fact that time and loyalty invested into an apprentice is rewarded in the form of gaining a long term enthusiastic and loyal employee, trained specifically to meet the diverse requirements of the business. 

Ravensthorpe WANDRRA 2017 contract award

Palmer Civil Construction was awarded Works Package 9 & 10 by the Shire of Ravensthorpe. The works are due to commence and will take place on Woodenup Road and Moolyall Road. The scope of works includes Floodway repairs/replacement;

  • Reinstatement of side and outfall drains to the existing lines and levels;
  • Shoulder repairs, including subgrade compaction and basecourse placement and compaction;
  • Pavement repairs, including reworking subgrade and supply and placement of basecourse material;
  • Gravel resheet, including supply, placement and compaction of the gravel;
  • Road reconstruction; where warranted to include all above from back-slope to backslope
  • Headwall repairs, including reinstating to their original location, repairing open joints with mortar and reinstatement to the culvert inlet / outfall areas; and
  • Clearing of the culverts, including removing any debris/silt and flushing silt from the culverts, including culvert inlet / outfall areas.

5 Years of Service

Palmer Civil Construction would like to thank and congratulate Dale Martin and Josh Buckley for their loyalty to the organisation and reaching this important milestone. Dale and Josh are both valuable members of our team and we look forward to watching them grow, develop and positively impact the future of PCC.